en-suite shower room installation Surrey

En-suite shower room installation in Ash Vale, Surrey

We were asked by this customer to completely re-install their en-suite shower room, update the design with new tiles on the walls and also the floor because some were cracked. Because one of the plasterboards behind the tiles was mouldy we erected a completely new timber studwork.

Installing an en-suite shower room

The studwork was boarded out with a special moisture resistant plasterboard before any plastering and tiling took place. We made sure the studwork fitted perfectly around the shower tray and the glass doors to prevent any leaks and ensure the shower room will be watertight.

Then we fitted the wall tiles and floor tiles were cut and fitted before the actual shower installation. The shower enclosure is then grouted and all internal corners sealed with silicon. Then we’ve done the joinery work, fitted the skirting boards and the door.

The walls had to be painted, we used paint specially for bathrooms. Underneath the rim of the shower tray we made a frame for any future repairs to the waste. The frame can be easily removed and then put back on.

The last bits to do were grouting the floor tiles, sealing the internal corners with silicon and hanging the shower door and mirror.

Floor repair Guildford

Floor repair in The Friary Centre in Guildford, Surrey

Commercial client from The Friary Centre in Guildford contacted us to perform floor repairs.

Aluminium edges

Previously incorrectly installed aluminium edges were posing a hazard for shoppers and required immediate attention. The challenge was to quickly install new fixes in just a few hours available after shop closing.

Repairing floor Surrey

Vinyl flooring project in Godalming, Surrey

A washing machine leak has damaged flooring and wall side. Client has called FixIt Surrey to the rescue.

Initial assessment

The old floor had to be completely replaced including skirting boards and part of the wall.

How we fixed it?

Wall was fully repaired and water adhesive was applied, all skirting boards were replaced completely.

Before we could lay the flooring we applied self leveling concrete and floor insulation.